Waste Technology Park

Neumünster, Germany, 2004
Client: Stadwerke Neumünster
General planning: Biodegma, ATI
Architects: KHR, Stuttgart
Structural engineering: Alfred Rein Ingenieure with Dr.-Ing. S. Greiner, Walter Fichtner Ingenieure, Horn + Horn

The decomposing hangars, with the dimensions 88 x 70m, consist of two rows of decomposing cells, 30m long, separated by a central passage 10m wide. The supports of the steel construction are strengthened longitudinally at 4,50m intervals by cross-members. Lateral rigidity is achieved through crossed tension rods between the vertical supports.